Magdeburg Water Bridge: Germany
Water Bridge |
Before the opening of the water bridge, ships moving between the Midland Canal and the Elbe-Havel Canal had to make a 12-km detour through the Rothensee lock, along the River Elbe and back up Niegripp lock. Now the bridge connects Hannover and Berlin directly and also Berlin’s inland harbour network with the ports along the Rhine. A double lock was constructed to descend to the Elbe-Havel Canal and a single Rothensee lock was constructed at the other end of the water bridge to descend to the Elbe and the Magdeburg harbour, making it independent of water levels and therefore navigable even for large ships.
The reunification of Germany and establishment of major water transport routes made the Water Bridge a priority again. Work started in 1997, with construction taking six years and costing €500 million. The water bridge now connects Berlin’s inland harbour network with the ports along the Rhine river. The aqueduct's tough structure incorporates 24,000 tonnes of steel and 68,000 cubic meters of concrete.
View of Water Bridge |